Terry was there this last weekend to help with the digging and de-construction too!
This is the flume side of the Mill below what was the log deck. The log deck is where raw logs got rolled into the Mill for sawing into various sized boards:



Above this are two shots of the timbers underneath the log deck and saw. The 'V' shaped flume was under there as well to carry sawdust out of the way and up into the sawdust pile on the far side of the entrance road.
This is a shot of where we dug out just past the log deck into the Mill next to where the old saw was located.

Here's Tim and Tim digging out the rest of the footings across from the log deck. We cleared out about 27 feet of foundation under the log deck this weekend. But all of that old rotten wood needs to be cleared away and new beams will be put in place during the re-build!
The old flume:
Terry will be back next month for more fun!